Civil Engineering MCQ Question|| Estimating costing Question for SSCJE and RRB JE

Quiz

This test completely based on Exam pattern and Syllabus, So give this test and Improve your preparations! Wish you very all the best!

Q.1 The unit of measurement is per quintal for

(A) collapsible Gate with rails
(B) rolling shutter
(C) expanded material wire knitting
(D) reinforcement of RCC works

Q.2 The damp proof course is measured in

(A) length
(B) area
(C) volume
(D) mass

Q.3 The most reliable estimate is

(A) plinth area estimate
(B) detailed estimate
(C) primary estimate
(D) cube rate estimate

Q.4 For one metre square single brick flat soling the number of bricks required is

(A) 54
(B) 62
(C) 32
(D) 44

Q.5 The quantity of brickwork in foundation and plinth per day per mason should be

(A) 1.75 cubic metre
(B) 2.5 M3
(C) 1 cubic metre
(D) 1.25 M3

Q.6 The plan of building is in the form of a rectangle with Central line dimension of The outer walls is 10.3 x 15.3 m the thickness of walls in superstructure is 0.3 then its carpet area is

(A) 150 metre square
(B) 157.59 metre square
(C) 165.36 metre square
(D) 165 metre square

Q.7 A work costing 20000 is termed as

(A) petty work
(B) Miner work
(C) major work
(D) minor project

Q.8 The density of cement is taken to be

(A) 1000 kg per metre cube
(B) 1250 kg per metre cube
(C) 1440 kg per metre cube
(D) 1800 kg per metre cube

Q.9 The value of property at the end of its useful life is Nan age

(A) Salvage value
(B) scrap value
(C) book value
(D) junk value

Q.10 Administrative head of Public Works Department who is directly responsible to government is

(A) assistant engineer
(B) excutive engineer
(C) Superintending engineer
(D) chief engineer